2025-2028
2025-2028
2021-2025
2017-2020
Like the last piece of a jigsaw falling into place, the Pavilions 2, 3 and 8 project marks the culmination of a 30-year reorganisation and reconstruction programme at Paris Expo Porte de Versailles.
On project completion, the whole exhibition centre will be in line with the highest international standards, and all its pavilions will benefit from landscaped spaces entirely free from logistical disturbances.
This suite of new pavilions will offer a spectacular view from the exhibition centre entrance and embellish the central avenue running through the grounds.
At the centre of the project, a triangular hall, Pavilion 3, will provide the geometric articulation for the grounds’ orientation pivot, while its 16-m indoor ceiling height and 100-m doors will help provide a worthy showcase for all events imaginable (conferences, concerts, arena shows, etc.).
Looking directly out at the Tour Triangle, a towering structure running 150 m in length, Pavilion 2, whose façade will run along avenue Ernest Renan, will be a prime setting for large exhibitions on two floors.
Meanwhile, standing immediately opposite the Paris Convention Centre, Pavilion 8 will supplement the convention offering, with the capacity to accommodate gatherings of up to 7,000 people.
All the roofs will be planted, conceived so as to be admired from the overlooking windows of Tour Triangle, Pavilion 7 and neighbouring residential buildings. Additionally, the roofs will harvest rainwater in accordance with Paris City Hall’s environmental rules. They will be bordered with 1,200 linear metres of planters holding shrubs and bushes which from below will appear like hanging gardens.
The facades, designed with particular care in both their composition and their construction, will be made of metallic panels in a subtle glossy grey, set off with strong dark horizontal lines. They will express the exhibition centre’s status as a major piece of public infrastructure.
Full details on the reconstruction project here.
Established in Paris with a subsidiary in Beijing, the firm today has eight associates and develops a multidisciplinary approach across complementary specialisms: architecture, urban development, interior architecture, BIM Management, and structure and façade engineering.
Pour Valode & Pistre, an architecture project is both an act of a social nature focussing on the customer and an act of creation designed to meet the needs of a specific programme and set of circumstances.
The firm works on a wide range of programmes, with more focused expertise on urban, residential projects and new mixed use neighbourhoods, along with major infrastructure, high-rise buildings, corporate head offices and office blocks, healthcare establishments, hotels and leisure facilities.
Eklo opened its doors on Thursday, February 8, 2024. A lifestyle, ecological and economical concept!
Work on the hotel began in March 2022 and will take 2 years to complete. Viparis has chosen Eklo as its partner to offer an atypical hotel experience aimed at a wide range of business and leisure customers.
Architect: Valode & Pistre
Valode & Pistre is an international agency, founded in 1980 by Denis Valode and Jean Pistre. Its areas of expertise include architecture, interior design, urban design and engineering. With an approach that emphasises the contextual and natural aspects of a project, Valode and Pistre have received commissions around the world, and have offices in China and Russia. Their work in France includes Pavilions 4, 5 and 6 for Paris Expo Porte de Versailles, the Musée d’Art Contemporain in Bordeaux, the Renault Technocentre, the T1 Tower at La Défense (headquarters of GDF Suez) and Lille’s Grand Stade.
Awards
The Architecture Academy’s Grand Silver Medal, Équerre d’argent
Motel One :
Motel One is a two-year project by Jean Viguier to be launched at the end of the month of September 2025.
Landscape intentions:
The proposed landscaping is diverse, such as the integration of the project into the neighborhood and hiding the ring road. A desire to develop biodiversity is present by creating a real green lung. Moreover, this project will create a new pole of attractiveness with a rich and mixed public space for users.
All these intentions will contribute to the comfort of visitors and employees.
Architect: Jean-Paul Viguier
His practice Jean-Paul Viguier SA d’Architecture, later renamed VIGUIER architecture urbanisme paysage is internationaly recognized thanks to iconic projects such as the France Televisions headquarters (Paris, France), the Cœur Défense tower (La Défense, France), the Sofitel Magnificent Mile hotel (Chicago, USA), the McNay Art Museum, first American museum of Modern Art built by a French architect (San Antonio, USA), the Maroc Telecom tower (Rabat, Morocco), the Majunga Tower (La Défense, France), the SFR Campus (Saint-Denis, France), the Cancer University Institute (Toulouse, France)…More recently, the practice has won many major architecture competitions including the Europea quarter in Brussels on the site of the 1958 World Expo around the Atomium, the Vinci headquarters in Nanterre as well as the competition for the highest wooden housing tower (57 meters) in Bordeaux, France, in the new district of the Saint-Jean Belcier train station.
Awards
Knight of the French National Order of Merit, Officer in the French National Order of the Legion of Honour, Commander of the French Order of Arts and Letters, Honorary Fellow of the A.I.A. American Institute of Architecture, Member of the French National High Commission for Historic Monuments - Ministry of Culture and Communication (1988-2005), President of AFEX (French Architects Overseas) (1997-1999), RIBA Registered (2015)
Pavilions 6 & 8 have been replaced by a brand-new structure, Pavilion 6. Vertical, digital banners in a variety of colours and sizes are suspended from a canopy. Prior to an event’s opening, the canopy gradually rises, revealing banners of coloured light. This dramatic process is completed on opening day. A few days before the end of the event, a reverse movement begins.
Architect: Jean Nouvel
A proponent of contextualised architecture, Jean Nouvel became known in Paris following his design for the Arab World Institute in 1987. His other Paris projects include the Cartier Foundation in 1994 and the Musée Quai Branly in 2006.
He has received commissions throughout the world, including such outstanding achievements as One Central Park in Sydney, the Doha skyscraper in Qatar and the Torre Agbar in Barcelona. He is currently working on the redevelopment of the Ile Seguin in Boulogne-Billancourt, and recently completed the new Philharmonie de Paris.
Awards
Pritzker Prize, UNESCO Architecture First Prize, Golden Lion from the Venice Biennale, Grand Prix National de l’Architecture, Équerre d’argent, Wolf Foundation Prize
This architectural project of two hotels, situated within the complex, will off er a total of 452 rooms. This includes the creation of a new entrance gate along Avenue de la Porte de la Plaine. The two buildings’ volumes and the composition of their façades create a harmonious whole. Large glazed surfaces reveal activities on the ground floor, while the building’s structure – a series of stacked volumes – create movement along the entire length of the buildings’ facades. On the roof, two terraces, visible from the ring road and its surroundings, are a bold architectural statement, highlighted at night by elegant lighting.
Architect: Jean-Michel Wilmotte
Jean-Michel Wilmotte founded in 1975 Wilmotte & Associés. This international architectural agency is specialised in 5 areas: architecture, interior architecture, museography, urbanism and design. Wilmotte & Associés has offices in France, Great Britain, Italy, South Korea and Brazil. The firm's 220 employees are involved in a wide variety of programs and projects in 26 countries. In 2005, Jean-Michel Wilmotte created the Wilmotte Foundation to introduce young architects to the issues of renovation of our architectural heritage.
Awards
Grand Prix National de la Création Industrielle, If Design Award, Prix Europa Nostra, Grand Prix du Rayonnement Français
The 26-metre-high Pavilion 1, with its 45,000 m² of exhibition space, is the largest single-level structure at Paris Expo Porte de Versailles. The façade is clad in an immense sheath of metal mesh, positioned several metres in front of the existing façade, thus creating a covered gallery and canopy. By turns iridescent, reflective and transparent, it reflects both daylight and evening illumination, and seems to shimmer depending on the passer-by’s point of view.
Architect: Dominique Perrault
Dominique Perrault, an architect and urban planner, attained international prominence in 1989 after winning the design competition for France’s Bibliothèque Nationale. Since then, he has received many commissions, both public and private, in the areas of sports and culture in Europe, South Korea and Japan.
His projects and achievements include the refurbishment of Naples' Piazza Garibaldi, the DC Towers in Vienna and the restructuring of Paris' central post office.
He is also a member of the Advisory Board for the Grand Paris project.
Awards
Grand Prix Afex, Grande Médaille d’or de l’Architecture, Grand Prix National d’Architecture, Équerre d’argent
Valode & Pistre rebuilt Pavilion 4 at the end of the 1990s. Pavilion 4 offers versatility, performance and comfort – and fulfils our expectations of what a modernisation project should achieve. To improve visitor comfort and highlight the Pavilion’s main entrance, a vast overhang will extend out from the structure, creating a dynamic place to meet and relax.
Architects: Valode & Pistre
Valode & Pistre is an international agency, founded in 1980 by Denis Valode and Jean Pistre. Its areas of expertise include architecture, interior design, urban design and engineering.
With an approach that emphasises the contextual and natural aspects of a project, Valode and Pistre have received commissions around the world, and have offices in China and Russia.
Their work in France includes Pavilions 4, 5 and 6 for Paris Expo Porte de Versailles, the Musée d’Art Contemporain in Bordeaux, the Renault Technocentre, the T1 Tower at La Défense (headquarters of GDF Suez) and Lille’s Grand Stade.
Awards
The Architecture Academy’s Grand Silver Medal, Équerre d’argent
An emblematic building in the Brutalist tradition, Pavilion 7 overlooks both the complex and the city of Paris. The original reinforced concrete structure has been enhanced and modernised, and a new facade has been put in place. Undulating glass surfaces create a rippling effect at each level, symbolising the neverending movement of the exhibitions and the momentum that brings the entire complex to life. Visitors to Pavilion 7 are treated to a breathtaking view of Paris. Level 7.3 houses the Paris Convention Centre, the largest in Europe.
Architects: Valode & Pistre
Valode & Pistre is an international agency, founded in 1980 by Denis Valode and Jean Pistre. Its areas of expertise include architecture, interior design, urban design and engineering. With an approach that emphasises the contextual and natural aspects of a project, Valode & Pistre have received commissions from around the world, and have offices in China and Russia. Their work in France includes Pavilions 4, 5 and 6 for Paris Expo Porte de Versailles, the Musée d’Art Contemporain in Bordeaux, the Renault Technocentre, the T1 Tower at La Défense (headquarters of GDF Suez) and Lille’s Grand Stade.
Awards
The Architecture Academy’s Grand Silver Medal, Équerre d’argent
Maxime GAUTHIER
Site Director
Viparis has appointed Maxime Gauthier as its main point of contact with the public throughout the construction of the new Pavilions 2 & 3. In his capacity as Site Director – Paris Expo Porte de Versailles, he is responsible for the operational management of the site and contributes to the implementation of Viparis' commitments in terms of communication and consultation with local residents. In this context, Maxime Gauthier will participate in the deployment of regular communication to local residents and site users, in conjunction with the project teams. His objective is to facilitate dialogue, share useful information on the progress of the work, and contribute to harmonious coexistence between the construction site and its surroundings.